Skip to main content
mediabuyer
Saved
ACCIONA | Sponsored native ad: Site C, the dam of the century: Supplying renewable energy for 100 years · Outbrain · AU
via mediabuyer
Visit page
First seen
May 7
Last seen
May 9

Site C, the dam of the century: Supplying renewable energy for 100 years

ACCIONA | Sponsored@acciona

Outbrain2d running
experience.acciona.com/transport/site-c-dam-century-…
Longevity2d / 30d

Tech & routing

Language
English

Operated by

Company info pending

Operator graph

Operated by TERA S.L · runs 1 domains across 1 networks

See operator profile →
Observed: Last seen: Days running: 2

Funnel

Capture in progress

We're still capturing the landing-page funnel for this creative. Check back in ~48h.

Landing page intelligence

experience.acciona.com

Redirect chain

1 hop
  1. finalexperience.acciona.com

Landing page snapshot

Landing page screenshot

Captured 2026-05-15

Tracking parameters

utm_source
dalton
utm_medium
cpc
utm_campaign
zemanta
utm_content
{{publisher_name}}
utm_term
australia
obOrigUrl
true

+ 1 known tracker hidden (cloaker IDs scrubbed at ingest).

Tracking setup · Outbrain

Outbrain emits ob_click_id (your unique click), ob_source (publisher), ob_section (placement), and ob_position. Forward ob_click_id to your tracker as the postback key. ob_source and ob_section are the two highest-signal sub-IDs for blacklisting.

?ob_click_id={ob_click_id}&ob_source={ob_source}&ob_section={ob_section}&ob_position={ob_position}

Default Outbrain setup template: ?ob_click_id={ob_click_id}&ob_source={ob_source}&ob_section={ob_section}&ob_position={ob_position}

Landing page text

Show landing page text

Visible text extracted from the advertiser's landing page · last fetched 2026-05-13

Site C, the Dam of the Century: Supplying Renewable Energy for 100 Years | Experience ACCIONA
Site C, the Dam of the Century: Supplying Renewable Energy for 100 Years
In the heart of northern Canada, ACCIONA has built one of its largest infrastructures on a global scale: a hydroelectric dam capable of supplying clean energy to nearly half a million homes. A milestone in sustainable engineering, built under extreme conditions and now a reality after nearly a decade of work. Discover it in this story.
On the ground of a plaza more than two hundred metres above sea level, an astronomical clock marks a moment in a 26,000-year cycle. It represents what is known as the precession of the equinoxes—the gradual tilt of Earth’s axis that slowly alters our view of the night sky. Translated into our era, the year is 1935. And the moment it marks, engraved into the structure itself, is the inauguration of the Hoover Dam in the United States. It was a project that  pushed the boundaries of engineering  and became the largest infrastructure of its kind in the 20th century.
The Hoover Dam was a monumental effort that brought water and electricity to the arid regions of Arizona and Nevada and it restored hope to a United States still grappling with the Great Depression. However, alongside its art deco splendor is an inscription that reads:  “They died to make the desert bloom.”  This phrase is a reminder of the toll of the project—not only in terms of economic challenges and construction difficulties but also in the loss of over a hundred human lives.
Nearly a century later,  ACCIONA and their partners were tasked with building another dam in the neighboring country to the north . The mission was to construct under extreme weather conditions, ensuring sustainability and safeguarding every human life. This project will carry forward the legacy of iconic projects like the Hoover Dam, but with innovation at the heart of the construction approach.
The result is Site C, a massive dam that will deliver clean energy to  nearly half a million British Columbian homes . It stands as one of ACCIONA's largest global infrastructure achievements and, after almost a decade of work, is now a reality. This article explores the process of creating a massive dam under extreme conditions, with temperatures plunging to -31°C, and displacing more than sixteen million cubic meters of earth— enough to fill six soccer stadiums.
How many energy infrastructure projects can generate renewable energy for a century while being built to  withstand an earthquake that occurs once every 10,000 years ? That was the ambitious mandate given to Site C by the province of British Columbia, requiring an innovative design from Peace River Hydro Partners (PRHP), a joint venture between ACCIONA Infrastructure Canada and Samsung Renewable Energy Inc. who were responsible for the main civil works contracts for the projects.
Situated along the Peace River, Site C is the third dam along this waterway in northern British Columbia. When you see the project, two features will immediately capture your attention. First, its sheer size— spanning nearly two kilometers across its two branches . Second, is its L-shaped configuration, combining an earthen embankment that dams the river head-on and a perpendicular section of roller compacted concrete and reinforced concrete.
These design elements are central to its mission: to ensure a robust infrastructure that will serve as one of British Columbia's energy cornerstones for the next century.
A photograph captures a night scene—a lone excavator at work beneath the ethereal green glow of the aurora borealis. This image shows two realities: construction at Site C never stopped, operating around the clock, year-round, and that it was carried out in a northern climate, often in  freezing temperatures.
To tackle these challenges, the winter months were dedicated to planning, tunnel excavation, drilling, and grouting (injecting concrete to fortify the tunnels). As temperatures rose in spring, construction of the concrete dam accelerated. At the peak of construction in 2023,  there were more than 6,000 workers on the project .
Before construction could begin on the dam, the Peace River’s course had to be temporarily diverted. This involved  excavating two tunnels, each 800 meters long and 11 meters in diameter , which were operational from 2020 to 2024.
The next stage involved creating a massive earthen dam that stands about 60 metres tall,  the height of a 20-storey building , stretches more than one kilometre across the Peace River, is about 500 metres wide at its base, and requires 16 million cubic meters of material. Most of this was sourced at the construction site, with the remainder transported via a five-kilometer conveyor belt.
The concrete dam that seals the reservoir in its L-shaped design required the equivalent of  280 Olympic-sized swimming pools of concrete  and enough steel to build  four Eiffel Towers.
An engineering and climate challenge
Construction at Site C continued year-round, enduring extreme conditions with temperatures plummeting to -31°C.
Eight hundred meters of tunnels
To begin the project, two 800-meter-long tunnels were excavated to divert the flow of the Peace River.
Short-lived tunnels
The tunnels served their purpose during construction but will be sealed once the project is completed.
An artificial mountain
The earthen dam, one of the dam’s two branches, was built using material equivalent to six soccer stadiums.
The dam of the century
The concrete dam, designed to withstand earthquakes and is built to operate for at least 100 years.
Helmets 2.0
Operators wore RFID-equipped helmets that warned heavy machinery drivers when workers were in close proximity to each other.
While hydroelectric power is inherently renewable, the construction process must also adhere to sustainability principles. This involves two key aspects: implementing measures to minimize impacts on local wildlife and employing construction techniques and materials that reduce the carbon footprint.
Over the last decade, innovative strategies have been developed to mitigate the impact of hydroelectric power on aquatic ecosystems. For Site C, a temporary fishway was constructed to allow passage for fish ascending the Peace River during construction.
Near the end of construction, a permanent fishway was completed, enabling species like bull trout to be transported safely upstream of the dam. Additionally, BC Hydro, the dam’s owner and operator,  restored various shallow-water habitats  and reestablished streamside vegetation to support aquatic life.
On the construction front, reducing the carbon footprint was a top priority. One significant measure was the use of a nearly five-kilometer conveyor belt to transport glacial till, which formed the core of the earthfill dam. By replacing traditional trucks and utilizing renewable electric power,  this strategy cut emissions by more than 1,500 tons .
INFOGRAPHIC . Site c: moving mountains to power Canada with renewable energy
At the Hoover Dam Museum, the recreations of the work environment reveal a striking detail, the lack of safety equipment for the workers who built it. Nearly a century later, the standards have improved dramatically. For Site C, ACCIONA implemented  cutting-edge safety measures  to mitigate risks in an environment characterized by extreme weather and heavy operations.
Dam construction involves moving massive quantities of earth and concrete, alongside the operation of heavy machinery. To enhance situational awareness, ACCIONA  deployed a system called SCAN~LINK  in addition to conventional safety measures.
This innovative system incorporated RFID tags on workers’ helmets and receivers on excavators and trucks,  triggering audible alerts  whenever an operator came within five meters of the machinery. Thanks to these advanced measures, no lives were lost during the project, which entered the testing phase at the end of 20…
8,001 chars

Text scraped from the landing page for research purposes. © respective owners. This text is sourced from the advertiser's public landing page; for removal, contact dmca@luba.media.

Similar ads

Other creatives in Other on Outbrain

More from ACCIONA | Sponsored

ACCIONA | Sponsored native ad: Outgrowing the shell: The repowering of a pioneer wind farm · Outbrain · AU
mediabuyer
OutbrainAU0d
Outgrowing the shell: The repowering of a pioneer wind farm
ACCIONA | Sponsored@acciona

Outgrowing the shell: The repowering of a pioneer wind farm The complete…

experience.acciona.com
Visit
ACCIONA | Sponsored native ad: Site C, the dam of the century: Supplying renewable energy for 100 years · Outbrain · AU
mediabuyer
OutbrainAU3d
Site C, the dam of the century: Supplying renewable energy for 100 years
ACCIONA | Sponsored@acciona

Site C, the Dam of the Century: Supplying Renewable Energy for 100 Years |…

experience.acciona.com
Visit
ACCIONA | Sponsored native ad: Fargo Moorhead diversion channel and regional flood protection · Outbrain · AU
mediabuyer
OutbrainAU3d
Fargo Moorhead diversion channel and regional flood protection
ACCIONA | Sponsored@acciona

Fargo–Moorhead stormwater diversion channel: Regenerative infrastructure to…

experience.acciona.com
Visit
ACCIONA | Sponsored native ad: Forest Parks and Historic Gardens: where culture and nature thrive together · Outbrain · AU
mediabuyer
OutbrainAU4d
Forest Parks and Historic Gardens: where culture and nature thrive together
ACCIONA | Sponsored@acciona

Forest Parks and Historic Gardens: Where Culture and Nature Thrive Together For…

experience.acciona.com
Visit
ACCIONA | Sponsored native ad: Tunnel boring machines enter immersive realities · Outbrain · AU
mediabuyer
OutbrainAU5d
Tunnel boring machines enter immersive realities
ACCIONA | Sponsored@acciona

Tunnel Boring Machines Enter Immersive Realities ACCIONA has begun virtualizing…

experience.acciona.com
Visit
ACCIONA | Sponsored native ad: The importance of onboarding in times of constant change · Outbrain · AU
mediabuyer
OutbrainAU11d
The importance of onboarding in times of constant change
ACCIONA | Sponsored@acciona

The importance of onboarding in times of constant change The importance of…

people.acciona.com
Visit
ACCIONA | Sponsored native ad: Revitalizing Villalba's olive groves: Empowered by renewable energy · Outbrain · AU
mediabuyer
OutbrainAU3d
Revitalizing Villalba's olive groves: Empowered by renewable energy
ACCIONA | Sponsored@acciona

Revitalizing Villalba's olive groves: Empowered by renewable energy ACCIONA…

experience.acciona.com
Visit
ACCIONA | Sponsored native ad: 3D Printing: Elevating Urban Furniture and Creating Distinctive Spaces · Outbrain · AU
mediabuyer
OutbrainAU2d2 hops
3D Printing: Elevating Urban Furniture and Creating Distinctive Spaces
ACCIONA | Sponsored@acciona

3D Printing: Elevating Urban Furniture and Creating Distinctive Spaces A…

experience.acciona.com
Visit